1st floor duct work installation

I learned a good lesson while working on the ducts in the garden unit. It is best to install them right after the framing is complete and preferably before the plumbing and electrical work.

Items such as plumbing and electrical are easily routed around the ducts. But it is difficult to route bulky ducts around electrical and plumbing lines… Plus, while finishing the framing, I had the duct work constantly on my mind. My incentive as to always make sure that I won’t maneuver myself into a corner again, where the duct installation may become difficult.

Some of the duct work is already taken off. It was the most difficult piece – inserting the exhaust duct down into the chimney.

It’s time to get started on the remaining duct work.

And this is only the start, literally. If you think back to the plan for the duct layout, you may recall how the branches spider out to the front and back of the 1st floor. May be I should put some details together that show the whole system?

About Marcus de la fleur

Marcus is a Registered Landscape Architect with a horticultural degree from the School of Horticulture at the Royal Botanic Gardens, Kew, and a Masters in Landscape Architecture from the University of Sheffield, UK. He developed a landscape based sustainable pilot project at 168 Elm Ave. in 2002, and has expanded his skill set to building science. Starting in 2009, Marcus applied the newly acquired expertise to the deep energy retrofit of his 100+ year old home in Chicago.

One thought on “1st floor duct work installation”

  1. Wow, what a lot of progress you are continuing to make! It’s been a while since I’ve visited – amazing what you have researched and found and concluded and decided. Thanks again for sharing all this with us.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.