It is time to make nails with heads, screws with threads, and foam with no gaps!
I covered the technical aspect of the 2nd floor insulation strategy, why we decided on two inches of closed cell spray polyurethane foam (SPF), and the importance of ending up with the right vapor permeance rate. We also had some excitement with our first blower door test, a prerequisite for the insulation rebate we are after.
It was time to get started with the hands-on part — the actual closed cell foam installation.
Skills
This is a good time to talk about skills. Not mine – but the skills of the SPF installer.
I had three different installers on this project. One for the garden unit, another one for the 1st floor, and Kent’s Thermaseal for the 2nd floor. I now wish I would have known about Kent’s crew when I started this project, because he would have done all floors for us.
Take a look at the video below. The cured spray foam surface may look a little rough and wavy. But believe me, that is the smoothest, most even closed cell application I have seen. It is incredibly difficult and takes a lot of skill to keep the spray foam at a consistent depth.
This experienced installer first sprays lines 16 inches on center, which he uses as depth gauges, and then sprays out the space in between.
Attention to detail
I have written about the potential consequences if the attention to detail is deficient during a SPF installation.
I didn’t have any of those issues this time around. You can see in the video how the installer is pacing himself, allowing for the foam to expand and cure, before he continues with the next pass.
He “over-sprays” at the bottom of the wall, an important detail that eliminates weak spots at this transition and change in planes.
If you carefully watch the video, you can see the installer using a depth gauge – a needle set to two inches which he pokes into the foam to see if he has reached the specified spray depth. The use of that depth gauge is not that remarkable. But the fact that the installer goes back to where he poked into the foam and applies another pass to seal up the pin hole he created, is remarkable. And he did that consistently.
That kind of attention to detail tickles me!
Related posts:
- Blower door test – before insulation
- 2nd floor insulation strategy
- Shrinking a long to do list
- Insulation preps – plugging the 3” gap
- Insulation preps – 3” thermal break
- Insulation update
- The insulation riddle is back
- Following the control layers
- Insulation riddle resolved
- Insulation – how much is needed
- Insulation – which material cuts it
- Insulation – starts with moisture management
- Insulation – lots of conflicts
- Insulation – how it started