The masonry repair work in the attic is done. But I have that one more task waiting for me, and it is green roof related. I need to get those pockets punched into the masonry wall for the sistered joists.
The process is similar to the range hood exhaust installation. I use the hammer drill with a masonry bit to drill out the mortar joints and set up a perforation line across the brick. Once that is done, I can grab a hammer and chisel and carve out the joist pocket.
In the kitchen at the chimney, the two joists stop short of the masonry wall. I placed a sister joist mock up along the roof joist, which allowed me to mark the exact location for the joist pocket. As for all the pockets, it was a tight space to work in. Nevertheless, the pockets turned out all right, and a test placement confirmed that the sistered joists would fit right in.